Custom Battery Pack Design Requirements: OEM RFQ Checklist

Custom Battery Pack RFQ Guide

Custom Battery Pack Design Requirements: OEM RFQ Checklist

A useful custom battery pack RFQ should define the application, electrical load, mechanical envelope, BMS and communication needs, charger and connector interfaces, operating environment and validation expectations before the design is frozen. This checklist helps OEM engineering and purchasing teams provide the information a battery supplier actually needs to move from quotation to a workable prototype.

Quick Answer

Do not send only voltage and Ah

A custom battery pack is a system integration project. Voltage and capacity are only the starting point. The supplier also needs continuous and peak current, duty cycle, BMS protection logic, communication interface, enclosure constraints, connector and charger requirements, temperature and ingress conditions, target-market documentation, and the test criteria that define an acceptable sample. Providing these inputs early reduces quotation assumptions, late redesign and prototype delays.

OEM RFQ Checklist

12 design inputs to define before a custom battery pack quote

The exact level of detail depends on project maturity. If some items are still open, mark them as assumptions rather than leaving them undefined.

RequirementWhat the OEM should provideWhy the battery supplier needs it
1. ApplicationEquipment type, operating mode, replacement vs new design, expected production use.Sets the design context, duty cycle, service expectations and application-specific risks.
2. Nominal voltageRequired system voltage and allowable operating voltage window.Defines cell series count, BMS voltage range, charger voltage and controller compatibility.
3. Capacity / energyTarget Ah or kWh plus required runtime under a defined work cycle.Determines parallel cell count, energy reserve, weight, size and thermal loading.
4. Continuous currentNormal operating current or power under sustained load.Drives cell selection, busbar, cable, connector, fuse and thermal design.
5. Peak currentStartup or transient current, duration and repetition frequency.Helps set BMS over-current logic and prevents nuisance shutdown or undersized power paths.
6. BMS functionsProtection thresholds, balancing, SOC/SOH needs, logging and service diagnostics.Defines control logic, sensing, data requirements and validation scope.
7. CommunicationCAN, RS485, RS232 or other interface; protocol, messages and controller/charger requirements.Ensures the battery, vehicle/equipment controller and charger exchange the required data.
8. Mechanical envelopeBattery compartment drawing, maximum dimensions, mounting points, removal path and service clearance.Prevents late enclosure redesign, cable strain, cover interference and poor field serviceability.
9. Connector / harnessPreferred connector, mating direction, cable exit, harness length and equipment-side interface.Links current capability, service access and equipment integration to the physical battery design.
10. ChargerCharger model or required voltage/current, charge location and communication needs.Confirms charging compatibility, cutoff behavior, connector arrangement and thermal conditions.
11. Environment / complianceTemperature, vibration, moisture/dust exposure, destination market and required transport/product documentation.Defines enclosure, sealing, thermal and validation requirements and the project compliance plan.
12. Prototype acceptanceRequired test data, equipment test, sample quantity, validation procedure and approval criteria.Creates a measurable gate between first sample, pilot build and mass production.
Electrical Requirements

Voltage, capacity and current must be tied to a real load profile

Battery sizing should start from how the equipment actually operates, not only from a nominal voltage label or an expected Ah number.

Voltage and usable energy

Specify the equipment operating voltage window and the runtime target under a defined work cycle. Energy in watt-hours is approximately nominal voltage × amp-hours, but usable runtime also depends on load profile, BMS limits, temperature and reserve margin.

  • Nominal system voltage
  • Minimum / maximum acceptable voltage
  • Target Ah or kWh
  • Expected runtime and work cycle

Continuous and peak current

Peak current is especially important for motors, pumps, compressors, traction systems and other equipment with startup or transient loads. Provide duration and repetition frequency whenever possible.

  • Normal continuous current
  • Peak current and duration
  • Regenerative or reverse current if applicable
  • Maximum charging current
If the OEM does not yet have a complete current trace, provide motor/controller power ratings and known startup behavior. The battery supplier can use them as engineering inputs, but the assumptions should be verified during prototype testing before the design is locked.
BMS & Communication

Define what the BMS must protect, measure and communicate

BMS requirements should be aligned with the controller, charger and service strategy before the sample is built.

Protection and control logic

Define protection thresholds and any application-specific timing or recovery logic for over-current, over/under-voltage, charge/discharge temperature and other relevant faults.

  • Cell and pack voltage protection
  • Charge/discharge over-current
  • Temperature protection
  • Balancing expectations
  • SOC / SOH and fault logging needs

CAN, RS485 and system interfaces

If the battery must communicate with an equipment controller, inverter or charger, define the physical interface and data requirements early. For protocol selection, see our CANBus vs RS485 guide.

  • Required interface and baud rate
  • Controller / charger integration
  • Required data points and alarms
  • Termination and connector requirements
BMS development and SMT production for custom battery pack projects
BMS hardware and firmware requirements should be defined as part of the battery architecture, not treated as a late-stage accessory.
Custom battery pack cell assembly and mechanical integration
Electrical architecture, cell layout and mechanical integration need to be reviewed together before prototype tooling and enclosure details are frozen.
Mechanical Integration

The battery compartment drawing is one of the most useful RFQ files

Mechanical constraints determine whether the final battery can actually be installed, connected, cooled, removed and serviced safely in the equipment.

Maximum envelopeLength, width, height, tolerances and nearby obstructions.
MountingTray, bolts, rails, hold-down points, anti-movement features and vibration conditions.
Cable exitDirection, bend radius, strain relief, grommets and service loops.
Connector accessMating direction, technician access and safe disconnect procedure.
Thermal spaceAmbient temperature, heat sources, airflow and allowable case temperature.
Service pathBattery removal route, cover clearance, lifting/handling and replacement time.

For projects where the battery wiring and equipment interface are customized, review our battery wiring harness capabilities and the OEM battery wiring harness design checklist.

Connector, Charger & Environment

Interfaces and operating conditions must be specified before design lock

Connector and wiring harness

Provide the preferred connector family if already fixed, or at least the required current, cable size, mating cycles, sealing level, mounting position and equipment-side connector. Connector selection should be reviewed together with harness routing and service access.

Charger interface

State whether an existing charger must be retained or a new charger can be selected. Include target charge voltage/current, connector arrangement, charge location and any CAN/RS485 handshake requirements.

Operating environment

Define minimum and maximum ambient temperature, moisture/dust exposure, vibration, cleaning chemicals, altitude or other conditions relevant to the equipment.

Compliance scope

Identify destination markets, transport requirements and any project-specific certification or documentation expected. Requirements such as UN38.3, IEC 62619, UL 1973, CE or RoHS depend on the product architecture, application and market; they should be confirmed as project requirements rather than assumed for every pack.

RFQ Package

What to send a battery supplier for a faster technical review

A concise, structured RFQ package is more useful than a long email with mixed assumptions. Send the files that define the equipment and clearly mark which values are fixed and which are still open for engineering discussion.

1. Application summary and expected annual / project volume
2. Voltage, capacity / runtime, continuous current and peak current
3. Battery compartment drawing or dimensioned photos / CAD
4. BMS protection, SOC/SOH and CAN / RS485 requirements
5. Connector, cable exit and equipment-side harness information
6. Charger model or required charging voltage/current
7. Temperature, vibration, moisture/dust and service conditions
8. Destination market and compliance / documentation requirements
9. Prototype test plan, sample quantity and acceptance criteria
Common RFQ Problems

Six reasons custom battery quotes become inaccurate or slow

Only voltage and Ah are providedThe supplier cannot correctly size current capability, BMS, wiring or thermal requirements.
No peak-current durationA single current number does not show whether the load is continuous, startup or repeated transient demand.
No compartment drawingThe electrical design may be feasible but the final pack may not fit or be serviceable.
Communication left until the endLate CAN/RS485 changes can affect BMS hardware, connector pinout, firmware and validation.
Compliance is assumedTarget markets and documentation scope should be defined before quoting and validation planning.
No sample acceptance criteriaWithout measurable pass/fail criteria, prototype approval becomes subjective and delays pilot production.
FAQ

Custom battery pack RFQ questions from OEM teams

What information should an OEM provide for a custom battery pack RFQ?

Provide the application, target voltage and capacity, continuous and peak current, duty cycle, BMS and communication requirements, enclosure constraints, connector and charger interface, environmental conditions, target-market compliance scope and sample validation requirements.

Why are continuous and peak current both required?

Continuous current defines sustained electrical and thermal load. Peak current shows startup or transient demand. Both influence cell selection, BMS settings, busbars, cables, connectors, fusing and thermal design.

Should the supplier receive the equipment battery compartment drawing?

Yes. Dimensions, mounting points, cable exit direction, connector access, cooling space and service clearances are important inputs for enclosure and harness design.

When should CAN or RS485 requirements be defined?

Before prototype design lock. Provide controller or charger interface requirements, protocol expectations, termination requirements and the data points that must be exchanged.

What compliance information should be included?

Identify destination markets, transport requirements and any product-specific certification or documentation needed. The exact compliance plan depends on the application, battery architecture and market.

Can an RFQ start before every detail is finalized?

Yes. Start with confirmed requirements and a clearly marked list of open items. Distinguishing fixed requirements from assumptions allows the supplier to manage technical risk without pretending uncertain inputs are final.

Preparing an OEM battery RFQ?

Send your application, voltage, capacity or runtime target, continuous/peak current, battery compartment information, communication requirements, charger/connector details and operating environment. Chalong Fly can review the project inputs and identify the engineering information needed before prototype design.

Blog Information

Latest insights from CLF: battery technology, energy storage, and industry updates.

Loading posts…

Get a Quote

Response within 24 Hours

Call Us (24/7)+86 155 7319 3244
Factory BaseChangsha, Hunan, China
Inquiry Form (ESS / Battery / Harness)

By submitting this form, you agree we may contact you about your inquiry. No spam.

Scroll to Top